Bribie Island becoming more accessible
However, the existing bridge is rapidly nearing the end of its life. The current two-lane bridge has been in place since the 1960’s and is expected to reach maximum capacity in 2031. In the last five years, there have also been seven closures to the 835 metre-long bridge. For locals and tourists, this makes the island much less accessible, with this decreasing further in future years.